Storage tank installation
with accessories
4.2.1
Dimensions
4.2.2

Installation requirements

GB
To adapt to the storage tank size, the upper flow pipe can be adapted to the required length
on site, and the connection is made via a compression fitting. For larger distances, the upper
flow pipe Cu 22*1 must be extended on site.
367
• Each of the SecuFresh 22 and SecuFresh 29 fresh water stations can be directly attached
to a buffer storage tank with simultaneous piping on the heating side by means of a
connection set.
• The storage tank must have a connection of 1 1/2" IT so that the station can be
connected.
• The upper flow pipe can be shortened. The lower pipe has a constant length.
• The connections for the storage tank are arranged vertically one above the other.
• The distances between the connections are within the illustrated range.
• For further information, please refer to the separate instructions for the connection set.
SecuFresh 22 and SecuFresh 29 Frischwasserstation