Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Requirements - OEG SecuFresh 22 Montage- Und Bedienungsanleitung

Frischwasserstation
Vorschau ausblenden Andere Handbücher für SecuFresh 22:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
22
4.2
Storage tank installation
with accessories
4.2.1
Dimensions
4.2.2

Installation requirements

GB
To adapt to the storage tank size, the upper flow pipe can be adapted to the required length
on site, and the connection is made via a compression fitting. For larger distances, the upper
flow pipe Cu
* must be extended on site.
• The SecuFresh
fresh water station can be attached directly to a buffer tank with
simultaneous piping on the heater by means of a connection set.
• The storage tank must have a ½" internal thread so that the station can be
connected.
• The upper flow pipe can be shortened. The lower pipe has a constant length.
• The storage tank connections are arranged vertically one above the other.
• The distances between the connections are within the illustrated range.
• For further information, please refer to the separate instructions for the connection
set.
[mm]
SecuFresh
Fresh water station

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis