For proper transport, also observe the instructions and information on the transport packaging regard-
ing centre of gravity, lifting points, weight, means of transport to be used as well as the prescribed
transport position etc. Ensure that the selected lifting equipment (crane, forklift, pallet truck, load sling,
etc.) is in perfect condition.
Lifting and transporting the machine may only be carried out by qualified personnel with appropriate
training for the lifting equipment used.
Risk of injury from suspended or unsecured load!
Damaged or insufficiently strong hoists and load slings can result in serious injury or even
death.
 Before use, therefore, check hoists and load slings for adequate load-bearing
14

OPERATION

14.1

Preparation

14.1.1

Checking delivery content

Check the delivery immediately for transport damage and missing parts. Report any damage or miss-
ing parts to your dealer or the shipping company immediately. Visible transport damage must also be
noted immediately on the delivery note in accordance with the provisions of the warranty, otherwise
the goods are deemed to have been properly accepted.
14.1.2

Requirements for the installation site

The selected installation site must ensure a suitable connection to the electrical mains. Observe the safety
requirements and the dimensions of the machine.
Place the machine on a level, solid surface. The chosen installation site of the machine must comply with
the local safety regulations as well as the ergonomic requirements for a workplace with sufficient lighting
conditions.
The floor at the installation site must be able to bear the load of the machine!
When dimensioning the required space, take into account that the operation, maintenance and repair of
the machine must be possible without restrictions at all times. In the case of long workpieces, no crushing
or shearing points may occur in the extension area (= danger area).
14.2

Assemble

The machine is preassembled only machine stand and accessories must be assembled before use. Follow
the instructions below:
ZIPPER MASCHINEN GmbH
www.zipper-maschinen.at
WAR N I N G
capacity and perfect condition. Secure the loads carefully. Never stand under
suspended loads!
N O TE
1.
Assembly machine stand
The corner legs (3) are fixed to the upper (1) and
lower support frame (2) with two screws (4) and
nuts (5) each.
The corner legs (3) are fixed at each corner with
two screws (4) and nuts (5) to the upper (1) and
lower frame (2).
Place the machine on the assembled table.