Herunterladen Inhalt Inhalt Diese Seite drucken

Daily Maintenance And Winterizing - IPSPRO IPS-110 pro Installations- Und Benutzerhandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

2.3. Daily maintenance and winterizing

2.3.1. Daily Maintenance
Please don't forget to cut off power supply of the heat pump
 Please clean the evaporator with household detergents or clean water, NEVER use gasoline,
thinners or any similar fuel.
 Check bolts, cables and connections regularly.
2.3.2. Winterizing
In winter season when you don't swim, please cut off power supply and drain water out of the
heat pump. When using the heat pump under 2℃, make sure there is always water flow.
Important:
Unscrew the water union of inlet pipe
to let the water flow out.
When the water in machine freezes in
winter season, the titanium heat
exchanger may be damaged.
- 11 -
FOR USER

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis