Herunterladen Inhalt Inhalt Diese Seite drucken

Replacing The Battery - PeakTech 4350 Bedienungsanleitung

True rms stromzange
Vorschau ausblenden Andere Handbücher für 4350:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

All manuals and user guides at all-guides.com

7. Replacing the battery

WARNING!
To avoid electrical shock, disconnect the test leads and any input
signals before replacing the battery. Replace only with same type
of battery.
This meter is powered by 2 x 1,5 V AAA batteries. When the
meter displays the battery symbol the batteries must be replaced
to maintain proper operation. Use the following procedure to
replacing the battery.
1. Disconnect test leads from any live source, turn the rotary
switch to OFF and remove the test leads from the input
terminals.
2. The battery cover is secured to the bottom case by a screw.
Using a screwdriver, remove the screw from the battery cover
and remove the battery cover.
3. Remove the batteries and replace with new equivalent
batteries.
4. Replace the battery cover and reinstall the screw.
Note: Batteries which are used up, dispose duly. Used up
batteries are hazardous and must be given in the for this being
supposed collective container.
40

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis