Herunterladen Inhalt Inhalt Diese Seite drucken

Information About Operating The Train - Märklin LINT Bedienungsanleitung

Nahverkehrszug
Vorschau ausblenden Andere Handbücher für LINT:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 81

9. Information about Operating the Train

- When running the train, make sure that the
remote controller is always pointed at the train.
- If the train goes outside of the range of the
remote controller (approximately 6 meters / 20
feet) it will go further but cannot be controlled
any more.
- After 5 minutes without a signal set at go by the
remote control, the train remains stopped. It
can be started again by any signal set at go.
After 10 minutes without a signal set at go, the
train shuts off. The train must first be turned
on again at the controller in order for it to start
again.
- No obstacle can be allowed between the train
and the remote controller.
- Do not turn the remote controller away from the
train.
troller.
17

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

29343

Inhaltsverzeichnis