3.4.2 ELECTRICAL WIRING WITH GAS LEAK CONTROL DEVICE (DUNGS VPS 504)
KEY TO LAY-OUT
X6 – 6 pin plug
X7 – 7 pin plug
B4 – Working signal
h1 – Hour counter
PG – Minimum gas pressure
switch
S3 – Remote lock-out signal
(230V - 0.5 A max.)
T6A – Fuse
TL – Limit thermostat
TS – Safety thermostat
V10 – Safety valve
V11 – Adjustment valve
4.
WORKING

4.1 COMBUSTION ADJUSTMENT

In conformity with Efficiency Directive 92/42/EEC the applica-
tion of the burner on the boiler, adjustment and testing must be
carried out observing the instruction manual of the boiler,
including verification of the CO and CO
flue gases, their temperatures and the average temperature of
the water in the boiler.
To suit the required appliance output, choose the proper set-
ting of the combustion head, and the air damper opening.

4.2 COMBUSTION HEAD SETTING

Loose the screw (A), move the elbow (B) so that the rear
plate of the coupling (C) coincides with the set point.
Tighten the screw (A).
Example:
The burner is installed on a 155 kW
boiler with an efficiency of 90%, the
burner input is about 172 kW using the
diagram, the combustion set point is 3.
The diagram is to be used only for initial
settings, to improve air pressure switch
operation or improve combustion, it
may be necessary to reduce this set-
ting (set point toward position 0).
2728
TO BE DONE BY
THE INSTALLER
D4199
concentration in the
2
kcal/h
kW
240
200,000
220
180,000
200
160,000
180
172
140,000
160
140
120,000
120
100,000
100
80,000
70,000
80
6
C
A
B
0
1
2
GB
~
230V
50Hz
D5109
3
4
Set point
S7015
5