Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Installation - SICK GLD20 Betriebsanleitung

Kompakt-lichtschranke
Vorschau ausblenden Andere Handbücher für GLD20:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
5

Electrical installation

8026844/2022-06-09 | SICK
Subject to change without notice
< 0.55 Nm
< 0.3 Nm
(Force < 30 N)
< 0.8 Nm
< 0.8 Nm
Figure 1: Tightening torque
The sensors must be connected in a voltage-free state. The following information must
be observed, depending on the connection type:
Male connector connection: Pin assignment
Cable: Wire color
Terminal connection: Pin assignment
Terminal connection:
1.
Open the cover.
2.
Swivel the 3/8" MPT (Male Pipe Thread) fitting in the right position horizontally or
vertically.
3.
Loosen 3/8" MPT connection.
4.
Remove sealing plugs.
5.
Lead voltage-free supply cable through.
6.
Connect sensor as per
7.
Retighten 3/8" MPT fitting with seal so that the IP enclosure rating of the device is
ensured.
< 0.4 Nm
table
15.
O P E R A T I N G I N S T R U C T I O N S | GLD20
OPERATING INSTRUCTIONS
en
25

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

G20

Inhaltsverzeichnis