PACK CONTENTS / INHOUD PAKKET / PACKUNGSINHALT /
ZAWARTOŚĆ OPAKOWANIA
GB
INSTALLATION GUIDELINES
1. Installations must comply with all Local/National Water Supply Authority Regulations/
Byelaws, Electrical Regulations and Building and Plumbing Regulations.
2. DO NOT install the product where it may become frozen.
3. DO NOT install in an outside environment.
4. DO NOT use oil-based, non-setting jointing compounds to make any connections.
5. To eliminate pipe debris it is essential that supply pipes are thoroughly flushed before
connecting to the Urinal flush Installation box.
6. Make sure the product is installed, commissioned, operated and maintained in accordance
with the recommendations.
7. Conveniently situated inlet isolating valve must be provided for full maintenance.
8. DO NOT install opposite reflective surfaces.
1373323-ML2-B
All manuals and user guides at all-guides.com
FE9
Urinal Flush Box
GB
NL
D
PO
x 1
Product Manual
Producthandleiding
Produkthandbuch
Podręcznik Produktu
1 1
1373323-W2-A
x 1
8
x 1
x 1