Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Instructions - Honeywell EEM400C-D-M Montage- Und Bedienungsanleitung

Energiezähler 3-phasig mit stromwandler mit m-bus schnittstelle, pic. 1
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Assembly and operating instructions EEM400C-D-M
Three-phase active power energy meter with M-Bus interface, Pic. 1
Description
Energy meter with M-Bus interface enables the reading of
all relevant data like meter reading, electricity, voltage and
power (active and reactive).
Technical data
Connection
Pic. 2
diagram
Dimensions
Pic. 3
Accuracy class
B according to EN50470-3,
1 according to IEC62053-21
Reference, Maxi-
I
= 5 A, I
ref
mum, initial current
operating voltage
3 × 230/400 V
Tolerance −20%/+15%
Counting range
000 000,0...9 999 999 kWh
LED-Ouptut
10 Imp/kWh
Connections
Conductor cross-section 1,5...16 mm
Main circuit
screwdriver pozi no. 1, slot n o. 2 ,
torque 1,5...2Nm
Connections
Conductor cross-section max. 2,5 mm
Control circuit
screwdriver pozi no. 0, slot no. 2,
torque 0,8 Nm
Operating
−25...+55°C (noncondensing
temperature
according standard EN50470)
Environment
Mechanical M2
Electromagnetic E2
Indicating elements
(Pic. 4)
T1total (kWh)
Shows total consumption
T1part. (kWh)
Shows partial consumption,
this value is resettable
CT
Shows the sett
current transformer ratio
Select
The transformer ratio can be selected
in Menu item Select, in the open
bridge Z1-Z2
P (kW)
Shows the instantaneous power
per phase or all phases
U (V)
Shows the voltage per phase
I (A)
Shows the current per phase
kWh
Shows the unit kWh when the
consumption is displayed
L1 / L2 / L3
For P-, U-, I- or Error display, the
corresponding phase is displayed
Error
In case of missing phase or wrong
current direction. The corresponding
phase is additionally displayed.
Notes before connecting
1. Do not connect L1, L2 or L3 to N
2. In order to avoid moisture in the meter due to
3. N must always be connected.
Attention!
These devices must only be installed by a professional
electrician, otherwise there is the risk of fire or the risk of
an electric shock.
Wiring diagram
6 A, I
= 10 mA
max =
st
, 50 Hz
AC
This connection is to be fused according to the local instal-
lation instructions.
,
2
Operation of the LCD display
,
2
See page with LCD menu navigation.
The bridge Z1-Z2 should be removed for adjusting the
transformer ratio.

Installation instructions

The three-phase energy meter can be attached to a 35 mm
rail (EN60715TH35).
The meter can be used only in installation cabinets.
Declaration of Conformity CE
We, Honeywell Technologies Sàrl, 1180 Rolle
(Switzerland),herewith declare, on our own responsibil-
ity that the product:
which this certificate refer to, are in accordance with the
directive 2014/32/EU (MID) and the following standards:
Conformity Assessment Body:
Murten, in September 2016
Signed:
condensate build-up, acclimatise the meter at room
temperature for about half an hour before connecting.
The secondary, mains current transformer con-
nection is to be connected to the phase to be
measured and therefore the transformer don't
have to be grounded.
EEM400C-D-M-MID
EN50470 parts 1 and 3 (electronic meter), of
October 2006.
■ Directive 2014/30/EG (EMC)
■ Directive 2014/35/EG (LVD)
METAS-Cert, Nr. 1259
CH-3003 Bern-Wabern
Urs Tanner, Site Quality Leader
English

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis