Assembly and operating instructions EEM400C-D-M
Three-phase active power energy meter with M-Bus interface, Pic. 1
Description
Energy meter with M-Bus interface enables the reading of
all relevant data like meter reading, electricity, voltage and
power (active and reactive).
Technical data
Connection
Pic. 2
■
diagram
Dimensions
Pic. 3
■
Accuracy class
B according to EN50470-3,
■
1 according to IEC62053-21
Reference, Maxi-
I
= 5 A, I
■
ref
mum, initial current
operating voltage
3 × 230/400 V
■
Tolerance −20%/+15%
Counting range
000 000,0...9 999 999 kWh
■
LED-Ouptut
10 Imp/kWh
■
Connections
Conductor cross-section 1,5...16 mm
■
Main circuit
screwdriver pozi no. 1, slot n o. 2 ,
torque 1,5...2Nm
Connections
Conductor cross-section max. 2,5 mm
■
Control circuit
screwdriver pozi no. 0, slot no. 2,
torque 0,8 Nm
Operating
■
−25...+55°C (noncondensing
temperature
according standard EN50470)
Environment
■
Mechanical M2
Electromagnetic E2
Indicating elements
(Pic. 4)
T1total (kWh)
Shows total consumption
■
T1part. (kWh)
Shows partial consumption,
■
this value is resettable
CT
■
Shows the sett
current transformer ratio
Select
■
The transformer ratio can be selected
in Menu item Select, in the open
bridge Z1-Z2
P (kW)
Shows the instantaneous power
■
per phase or all phases
U (V)
Shows the voltage per phase
■
I (A)
■
Shows the current per phase
kWh
■
Shows the unit kWh when the
consumption is displayed
L1 / L2 / L3
For P-, U-, I- or Error display, the
■
corresponding phase is displayed
Error
In case of missing phase or wrong
■
current direction. The corresponding
phase is additionally displayed.
Notes before connecting
1. Do not connect L1, L2 or L3 to N
2. In order to avoid moisture in the meter due to
3. N must always be connected.
Attention!
These devices must only be installed by a professional
electrician, otherwise there is the risk of fire or the risk of
an electric shock.
Wiring diagram
6 A, I
= 10 mA
max =
st
, 50 Hz
AC
This connection is to be fused according to the local instal-
lation instructions.
,
2
Operation of the LCD display
,
2
See page with LCD menu navigation.
The bridge Z1-Z2 should be removed for adjusting the
transformer ratio.
Installation instructions
The three-phase energy meter can be attached to a 35 mm
rail (EN60715TH35).
The meter can be used only in installation cabinets.
Declaration of Conformity CE
We, Honeywell Technologies Sàrl, 1180 Rolle
(Switzerland),herewith declare, on our own responsibil-
ity that the product:
which this certificate refer to, are in accordance with the
directive 2014/32/EU (MID) and the following standards:
Conformity Assessment Body:
Murten, in September 2016
Signed:
condensate build-up, acclimatise the meter at room
temperature for about half an hour before connecting.
The secondary, mains current transformer con-
nection is to be connected to the phase to be
measured and therefore the transformer don't
have to be grounded.
■
EEM400C-D-M-MID
EN50470 parts 1 and 3 (electronic meter), of
■
October 2006.
■ Directive 2014/30/EG (EMC)
■ Directive 2014/35/EG (LVD)
METAS-Cert, Nr. 1259
CH-3003 Bern-Wabern
Urs Tanner, Site Quality Leader
English