Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Refrigerant Piping - Mitsubishi Electric Mr.SLIM PCA-RP KAQ Serie Installationshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 15

4. Installing the refrigerant piping

45 2
Flare cutting dimensions
Copper pipe O.D.
(mm)
6.35
9.52
12.7
15.88
19.05
Copper pipe O.D.
(mm)
6.35 (1/4")
9.52 (3/8")
12.7 (1/2")
15.88 (5/8")
19.05 (3/4")
Downloaded from
www.Manualslib.com
Fig. 4-1
Flare dimensions
A dimensions (mm)
8.7 - 9.1
12.8 - 13.2
16.2 - 16.6
19.3 - 19.7
23.6 - 24.0
B
Die
Copper pipe
Fig. 4-2
B (mm)
Flare tool for R410A
Clutch type
0 - 0.5
0 - 0.5
0 - 0.5
0 - 0.5
0 - 0.5
Fig. 4-3
manuals search engine
4.1. Precautions
• Use ester oil, ether oil or alkylbenzene oil (small amount) as the refrigera-
pipes, to connect the refrigerant pipes. Use refrigerant pipes with the thick-
clean and do not contain any harmful contaminants such as sulfuric com-
Warning:
erant and do not allow air to remain in the lines. Air enclosed in the lines can
cause pressure peaks resulting in a rupture and other hazards.
RP35, 50
Liquid pipe
6.35 thickness 0.8 mm
Gas pipe
12.7 thickness 0.8 mm
4.2. Connecting pipes (Fig. 4-1)
• When commercially available copper pipes are used, wrap liquid and gas pipes
with commercially available insulation materials (heat-resistant to 100 °C or
more, thickness of 12 mm or more).
• The indoor parts of the drain pipe should be wrapped with polyethylene foam in-
• Use 2 wrenches to tighten piping connections.
• Use refrigerant piping insulation provided to insulate indoor unit connections. In-
sulate carefully.
Flare nut tightening torque
Copper pipe O.D.
Flare nut O.D.
(mm)
(mm)
6.35
6.35
9.52
12.7
12.7
15.88
15.88
19.05
Available pipe size
RP35, 50
Liquid side
Gas side
4.3. Indoor unit (Fig. 4-3)
Installing procedures
1. Slide the supplied pipe cover
over the gas tubing until it is pressed against the
sheet metal inside the unit.
2. Slide the provided pipe cover
over the liquid tubing until it is pressed against
the sheet metal inside the unit.
3. Tighten the pipe covers
and
at the both ends (20 mm) with the supplied
bands
.
Gas tubing
Pipe cover
Liquid tubing
Press the pipe cover against the sheet metal.
Band
Refrigerant tubing heat insulating material
Pipe cover
4.4. For twin/triple combination
Refer to the outdoor unit installation manual.
RP60-140
9.52 thickness 0.8 mm
15.88 thickness 1.0 mm
Tightening torque
(N·m)
17
14-18
22
34-42
22
34-42
26
49-61
29
68-82
29
68-82
36
100-120
36
100-120
RP60
RP71-140
6.35
5
-
-
-

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis