Installation and electrical
connection
DANGER! Risk of fatal injury!
Incorrect installation and improper
electrical connections can be life-
threatening.
The installation and electrical con-
nection must be carried out only by
qualified personnel in accordance
with applicable regulations.
Observe the regulations for acci-
dent prevention.
Before installation and electrical
connection, disconnect the system
from the power supply and make
sure it cannot be switched on by
unauthorised persons.
Disconnect the mains plug!
6
Figure 1: Condensate pump KP 50
1
Condensate inlet
2
Connection for additional condensate inlet
3
Condensate discharge with non-return valve
4
Clips for opening the condensate collection reservoir (both
sides)
5
Condensate collection reservoir
6
Transport securing mechanism (both sides)
6.1

Preparations for installation

Select an installation location suitable for the
size of the unit and accessibility of the con-
nections.
Dimensions of the unit (H x W x D): 210mm x
120mm x 167mm
EN
The condensate lifting unit must be installed in
a dry, well-ventilated, frost-free room.
NOTE! The motor unit of the conden-
sate lifting unit can be placed either
clockwise or anti-clockwise on the
condensate lifting unit, depending on
the installation site.
Press in the housing clips (Figure 1, item 4)
Remove the motor unit.
If necessary, turn the motor unit, set it in place
and press down until the housing clips click
audibly.
6.2

Wall-mounted installation

WARNING! Risk of injury!
If installation is not properly carried
out there is a risk of injury and the unit
can be damaged. Have installation car-
ried out by qualified personnel only.
CAUTION! Risk of damage!
3
Position the product on the wall and
align it horizontally with a spirit level.
The product must be aligned perfectly
2
in order to function properly.
Fasten the unit to the wall with two screws
Ø4mm.
1
6.3
Installing the condensate lift-
ing unit
4
CAUTION! Danger of malfunction!
Improper inlet and discharge connec-
tions can cause the machine to mal-
5
function. The inlet and discharge hos-
es must not become trapped or kinked
after
bending radius of the hoses must not
be less than 100mm. In order to guar-
antee optimum pumping of conden-
sate, the condensate must flow unhin-
dered into the unit via the inlet hose,
and the discharge hose must always
be routed on a constantly rising gradi-
ent.
The 30mm diameter (Figure 1, item 1) con-
densate inlet opening is in the condensate
collection reservoir. If necessary, a second in-
let with a diameter of 19mm (Figure 1, item 2)
can be used by pressing out the perforated
seal. A hose with a diameter of 10mm is pro-
installation.
The
Installation
permissible
4