Herunterladen Inhalt Inhalt Diese Seite drucken

First Use; Programming Of The Dosage - ECM Manufacture Barista A2 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Important
• Ensure a slope in the drain pipe so that the water cannot accumulate
• Connecting the machine to a fixed water connection and installing the pressure regulator
has to be carried out by authorized service personnel.
• In order to avoid a premature calcification of your machine, we recommend to install a
water softening system.
5

FIRST USE

5.1 First use
Read the instruction manual carefully prior to operating the machine.
Prior to starting the machine, check if:
• The steam and hot water valves are closed.
• The valve for draining the boiler is closed.
• The machine is switched off. (On/Off dial in position 0.)
Now you can start up your machine:
Switch the rotary dial to position 1, so that the boiler is filled. The boiler is filled as soon as the pump stops.
Now switch the rotary dial to position 2. This makes sure that the machine is filled with water only when
heated up. Press the P-button of each brew group to release water.
Caution!
The heating element can burn if the machine is heated up without being filled with water (rotary dial
at position 2).
control lamp red
control lamp green
control lamp red = The water level is too low and the pump fills the boiler
control lamp green = The machine is switched on

5.2 Programming of the dosage

To program the doses, proceed as follows:
Choose a porta filter and fill it with the desired quantity of ground coffee for the button you would like to
program (The marking inside the filter basket can help you find the right amount of coffee). Place a cup
under the porta filter.
Translation of the German original user manual
ENGLISH
21

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

88685

Inhaltsverzeichnis