Herunterladen Inhalt Inhalt Diese Seite drucken

Assembling The Top Rails; Installing The Top Metal Pieces; Installing The Top Platforms - Swim & Fun 2900 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 117
8.

Assembling the top rails

Remove the clips one at a time whilst applying the top rails. (See diagram 19, A: Top Plastic Rail).
Slide the rail connectors into one end of a top rail (see diagram 20), then connect another top rail
and continue around the pool until all top rails are joined together. Keep the same 1.5 cm gap as
the bottom rails.
Do not cut the excess overlap off the
pool liner. If you cut the overlap, it will
make the next pool installation step
difficult. Also do not tape the overlap
to the top rail, as it will cause difficult-
ly when you fix the top rails.
9.
Installing the top
metal pieces
Hook the top metal pieces over the top
of the rails (see diagram 21). The first
metal piece should be placed on top of and in the middle of the steel wall joint.
Install the top metal pieces in correspondence with the bottom metal pieces installed in the above
diagram 5. (See diagram 21).

10. Installing the top platforms

Install the top
platforms starting
from the steel wall
joint as shown in
diagram 22. Ad-
just the distance
between the two
metal pieces if
necessary to ac-
commodate for
the top platforms.
MV-2900-2901-2902-2903-2930-2931-2932-2933-08-2021 . © All rights reserved Swim & Fun A/S
UK
105

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

290129022903293029312932 ... Alle anzeigen

Inhaltsverzeichnis