Herunterladen Inhalt Inhalt Diese Seite drucken

Start-Up - ECOLAB LMIT09 Kurz- Betriebsanleitung

Transmitter für elektrodenlose leitfähigkeitsmessung und temperaturmessung
Vorschau ausblenden Andere Handbücher für LMIT09:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Start-up

6
Start-up
Personnel:
Protective equipment:
CAUTION!
Installation and start-up work must only be performed by authorised,
trained technical personnel. We recommend engaging the services of
Ä 'Manufacturer' on page 7.
Ensure that the supply voltage complies with the voltage displayed on the
rating plate.
Before initial start-up, check that all system components are firmly seated/
installed. After performing configuration work on the open unit, make sure
it is properly closed again. A complete acceptance log must be compiled
during the initial start-up of the system.
Check that all connections are correctly fitted.
NOTICE!
The device has already been calibrated at the factory and is ready for use.
It is delivered with a basic configuration (see
exist but @y.link.required='true'
Switch on
Before switching on the unit, familiarise yourself with its operation.
Refer in particular to
instructions supplied with the relevant unit (
On connection of the supply voltage, the start screen is displayed briefly with information
about the software version.
Display screen after switching on the supply voltage
Check of conductivity calibration
The conductivity simulator, article no. 289190 (EBS no. 10001656), and the calibration
resistance 38 k3 (200 µS/cm), article no. 289191 (EBS no. 10092914), can be used for
calibration purposes and to monitor the calibration.
417101558 Rev. 06-06.2021
n
Specialist
n
Qualified electrician
n
Mechanic
n
Service personnel
n
Protective gloves
n
Protective eyewear
n
Safety shoes
).
Ä 2 'Safety' on page 8 and the description provided in the operating
The conductivity/concentration and temperature are then shown,
as well as all important settings and operating statuses
(see
linktarget [Displayanzeigen] doesn't exist but @y.link.required='true'
Use the menus to perform the configuration and parametrisation
in accordance with your application process (see the description
provided in the operating instructions for the relevant unit
(
Ä 'Available instructions' on page 4)). To do this, remove the
cover from the unit and replace it properly and carefully again once
the adjustments have been made.
30
linktarget [LMIT09 Werkseinstellungen] doesn't
Ä 'Available instructions' on page 4).
).

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis