Safety Notes
Gloves should be worn during installation to prevent
crushing and cutting injuries.
Installation Instructions
• Prior to installation, inspect the product for transport
damages. After it has been installed, no transport or
surface damage will be honoured.
• The pipes and the fixture must be installed, flushed
and tested as per the applicable standards.
• The plumbing codes applicable in the respective
countries must be oberserved.
• There must be an access door for maintenance.
• When assembling the iBox universal with integrated
safety combination (HD) pay attention that the middle
of the mixer is min. 280 mm above the upper edge of
the bath tub.
2
English
Center bath tub
Assembly see page 6
• When installing a different flush-type fitting than the
iBox universal, DIN EN 1717 requires the pipe inter-
ruptor (DB) to be at least 150 mm above the tub brim.
• Connection with flexible hose
• After completion the whole installation must be
flushed.
Technical Data
Operating pressure:
Recommended operating pressure:
Test pressure:
(1 MPa = 10 bar = 147 PSI)
Hot water temperature:
Recommended hot water temp.:
Pressure test max. 10 min
Thermal disinfection:
The product is exclusively designed for drinking water!
max. 1 MPa
0,1 - 0,5 MPa
1,6 MPa
max. 80°C
65°C
max. 70°C / 4 min