Herunterladen Inhalt Inhalt Diese Seite drucken

Pin Allocation; Maintenance And Care - led2work TUBELED 40 Element Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

TUBELED_40 Element AC
On the luminaire is an input for about a M12 connector S-coded. About this jack and
with suitable connection material the luminaire is connected with a 230V AC electric
power supply system.
For the installation on the power supply system the luminaire must
be electrically load-free. A direct connection of a luminaire via a
running machine can destroy the LEDs!
PIN assignment of the M12 connector is as follows:
1
Schematic drawing of M12 S-coded

6 | Maintenance and Care

The LED luminaire is maintenance-free. Do not make any alterations to the luminaire
(except according to the mounting information contained in this manual).
The luminants used in the luminaire have a very long life and cannot be replaced.
Turn off the light before cleaning and let it cool down completely. Clean the outside of
the luminaire with a soft, dry and clean cloth. To remove excess dirt, moisten the cloth
with water. Never use aggressive cleaning agents, as these may cause discolouration
of the housing.
No liability is assumed for damages resulting from the use of unsuit-
able cleaning agents. The manufacturer is also not liable for direct
or indirect consequential damage caused by unauthorized interven-
tion in the luminaire.
TUBELED_40 Element AC: The internal power supply unit may
only be changed by qualified personnel. No warranty is given for
power supplies unit not approved by the manufacturer.
14 | BA TUBELED_40 Element . BA 06/2021

PIN allocation

PIN 1 = not connected
4
PIN 2 = external conductor/
phase (L)
3
PIN 3 = neutral conductor (N)
2
PIN 4 = protective earth
conductor (PE)
brown
black
gray
green/
yellow

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis