Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Start-Up; Prior To Installation; Installation - Gaggia Ruby Pro Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für Ruby Pro:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 39
4.

Installation and Start-Up

4.1 Prior to Installation

 Models with connection to mains water supply
This equipment shall be installed in accordance
i
with local plumbing codes
Models with vibrating pump include as an
accessory a pressure reducer and a pressure
gauge to adjust the network pressure to 1 bar.
Verify before Installing:
1. Drainage tube with an interior diameter no less
than 35 mm.
2. Mains water network supply tube connected to
water softener.
3. Stopcock with 3/8" G exit.
4. Grounded plug protected with a magneto-
thermic circuit breaker.
5. Water supply tube (supplied with machine)
from water softener.
6. Drain tube
7. Water softener
Models with internal Water Tank
Verify before Installing:
1. Grounded plug protected with a magneto-thermic
circuit breaker

4.2 Installation

Once the machine has been unpacked, the following steps should be performed:
Check that the electricity supply voltage is the same as that listed on the specification plate and in the machine's
documentation.
20
17

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ruby

Inhaltsverzeichnis