Herunterladen Inhalt Inhalt Diese Seite drucken

Clearance; Tools & Safety Gear Required; Appearance And Dimensions; System Clearance - LG RESU 16h Rrime Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3.1.5

Clearance

Ceiling
500 mm
(20")
300 mm
300 mm
(12")
(12")
Floor
3.1.6
Tools & Safety Gear Required
• Tools
The following tools are required to install the battery pack :
Precision screwdriver
M5 torque wrench
Drill
Pencil or marker
(min. diameter 10 mm, 0.4")
* The fasteners are needed for fi xing the bracket on the wall
• Safety Gear for Personal Protection
It is required to wear the following safety gears when handling the battery pack.
Insulated gloves
Safety goggles
3.1.7

Appearance and Dimensions

• Appearance
Proper handling and care are recommended as disassembly, change of color,
scratches, leakage of liquid, and stains may infl uence the economic value of the
battery pack.
• Pack appearance and dimensions
1,086 mm
(42.8")
504 mm
295 mm
(19.8")
(11.6")
• Recommended clearances for the left,
right and top of the product are shown in
the fi gure for the proper ventilation and
installer convenience.
Inclinometer
Tape measure
Safety shoes
14
• Color and materials
- Battery Module front/rear case:
metallic gray, steel
- Battery Control Unit cover &
Module Connect Plate: metallic gray,
aluminum
- LED cover: black, plastic
3.1.8

System Clearance

The battery requires adequate clearance for installation, cabling, and airfl ow. The minimum
clearance for system confi guration is provided below. The cable connecting between battery
pack and inverter should be in accordance with the installation guide manual of the inverter.
NOTE
An external DC isolator may be installed within the clearance zone. Minimum clearances
may be greater according to local regulations.
Ceiling
Ceiling
500mm
500mm
(20")
(20")
300mm
300mm
(12")
(12")
Floor
Floor
3.1.9

Installing the Battery Pack

CAUTION
Make sure that the inverter AC and DC disconnects are turned off before connecting the
power cable to the battery pack.
Install the battery pack through the following steps:
Area1
Area2
Area1
Area2
Ex) If min. clearance is 200mm,
Ex) If min. clearance is 200 mm,
Wall
Wall
Ok
203 mm
OK
203mm
Ok
305 mm
OK
305mm
Front
Front
Front
MODULE CONNECT
LATE 1
Wall
direction
Rear
Wall direction
300mm
300mm
(12")
(12")
Inverter
Inverter
1. Place the Drill template to the wall
where the battery pack will be
installed. After that, drill holes on the
position marked on the Drill template.
* Recommended fastener count:
1(Area1)/1(Area2)
* Recommended fastener diameter/
length: 10mm/40mm Min.
* Fastener separation should observe
the regional building code.
2. Place a spacer to the position marked
on the Drill template. After that, place
the Module connect plate in contact
with the Spacer and align center lines.
* Pay attention to the direction of
the Spacer. Refer to left image for
correct orientation.
* Do not use anchor bolts to fi x the
Module connect plate to the fl oor.
* Be careful not to damage the
aluminum foil attached on the
bottom of Module connect plate
during handling.
7

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis