Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Wiring - Riello 40 Montage- Und Bedienungsanleitung

Zweistufig-gleitender oder modulierender betrieb
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 28
4.

ELECTRICAL WIRING

4.1 ELECTRICAL SYSTEM,
LME 22
ATTENTION:
Do not swap neutral and phase over, follow the diagram
shown carefully and carry out a good earth connection.
The section of the conductors must be at least 1mm².
(Unless requested otherwise by local standards and legis-
lation).
The electrical wiring carried out by the installer must be in
compliance with the rules in force in the country.
TESTING
Check the shut-down of the burner by opening the thermo-
stats, and the lock-out by opening the connector (CN3)
inserted in the red cable of the probe placed outside of the
control box.
NOTES
The burners have been type-approved for intermittent opera-
tion. This means they must stop at least once every 24 hours
in order to allow the electrical control box to check its effi-
ciency on start-up. The boiler limit thermostat (TL) normally
ensures the burner halts. If this does not happen a time
switch halting the burner at least once every 24 hours must
be applied in series to limit thermostat (TL).
(as set up by the manufacturer)
7
GB
XP7 – 7 pole socket
XP4 – 4 pole socket
XP6 – 6 pole socket
MB
– Auxiliary terminal block
S1
– Switch for:
MAN = manual operation
AUT = automatic operation
OFF = stand by
S2
– Button for:
– = power reduction
+ = power increase
TB
– Burner-earth
SO
– Ionisation probe
CN... – Connectors
TA
– Ignition transformer
PA
Min. air pressure switch
PAM –
Max. air pressure switch
C
– Motor capacitor
SM
– Servomotor
S8516
2622

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis