Herunterladen Inhalt Inhalt Diese Seite drucken

After Finishing Work; Transporting; Transporting The Tiller - Stihl MH 700 Gebrauchsanleitung

Vorschau ausblenden Andere Handbücher für MH 700:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
English

12 After Finishing Work

12.1 After Finishing Work
► Stop the engine.
► Allow the tiller to cool down.
► If the tiller is wet: allow the tiller to dry.
► Clean the tiller.
► Clean the hoes.

13 Transporting

13.1 Transporting the Tiller

► Switch off the engine.
► Detach retaining pin (1) and remove pin (2).
70
► Fold front wheel (3) downwards so bores (4) align.
► Insert pin (2) through bores (4).
► Push retaining pin (1) through the bore in pin (2).
Pin (2) is secured and front wheel (3) is in the transport
position.
► If the tiller is being transported using the front wheel:
► Place the front wheel in the transport position.
► Hold the tiller by both handles and lift so it is resting on
the front wheel.
► Push or pull the tiller slowly.
12 After Finishing Work
0478-404-9804-A

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis