• The hot water tank may be placed in sec-
tion 1 or 2 indicated in the picture, observ-
ing the standard MSZ HD 60364.
• In case of vertically positioned hot water
tanks, at least 100 cm service distance must
be left from the side of the service opening.
• To decrease heat loss attributable to the
hot water pipe, the appliance should be
installed the closest possible to the wa-
ter withdrawal locations. Hot water pipes
should be added heat insulation .
5. CONNECTION TO THE WATER SUPPLY
The container and assemblies required for its operation must be
connected to the water network according to figure 14-3.
5.1.
It is forbidden to connect the appliance using a hose.
For cold and hot water connections, steel or red copper pipe rated for 0.6 MPa
nominal pipeline pressure, heat resistant plastic pipe rated up to min. 100 °C or
flexible connection may equally be used. When connecting to a copper pipeline,
the use of insulating spacers is compulsory.
One spacer must be inserted on the hot water pipe of the container immediately,
while the other one on the cold water pipe, between the already installed assem-
blies and the copper water pipeline. If no spacer is used at the connections, we
neither provide guarantee for failures attributable to the corrosion of the thread-
ed tank pipes, nor assume liability for damages caused by the same.
The spacer is not included; you can order it under the following part number:
• 1/2" spacer: 1252122514
It is forbidden and dangerous to expose the container
to pressures higher than the
allowed operating pressure!
NETWORK
Figure 4.1.-2
3 3 3
EN