Herunterladen Inhalt Inhalt Diese Seite drucken

Abus FUBE50000 Installations- Und Bedienungsanleitung Seite 39

Secvest funk-bedienteil
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
8.
Teach in the wireless control
panel (see chapter "Read-in
process") and lock the cover
in place.
9.
Once installation and
commissioning have been
completed, start the
calibration of the chip key
reader manually by
pressing the
and
keys at the
same time.
The control device must be closed and screwed in at this point, and
positioned in its final installation location.
During the calibration of the chip key reader, the status LEDs for sub-areas
1 to 4 light up one after the other (sequence of lights from top to bottom).
Keep the chip key and any other metal objects away from the chip key
reader during calibration to avoid disrupting the process.
Installation and start-up
EN 15

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis