Herunterladen Inhalt Inhalt Diese Seite drucken

Battery Care; Installation - Victron energy PPP-8 Anleitung

12,8v / 8 ah – 102 wh; 12,8v / 20 ah – 256 wh; 12,8v / 30 ah – 384 wh; 12,8v / 40 ah – 512 wh;
Vorschau ausblenden Andere Handbücher für PPP-8:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 57

3. Battery care

• The PPP must be fully charged before first use. A full charge is
indicated by the blue LED lighting continuously
• When not in use, the PPP must be switched to storage mode
and fully charged at least every 12 months
• In case of seasonal use the PPP must be at least 50 %
charged before storing. Pressing the button for 5s will put the
PPP in storage mode, acknowledged by flashing blue.

4. Installation

When placing the Peak Power Pack it should be observed that it
has sufficient ventilation all around. A space of at least 5 cm must
be allowed.
In case of high temperature, the product will switch off, and an
error is indicated by the LED flashing red.
The Peak Power Pack leaves the factory in storage mode to
protect
it
from deep discharge. Prior to first use, the button must
be pressed for 5s. The PPP is now ready for use, confirmed by
the LED flashing blue.
Installing the PPP in a caravan
The enclosure is made of plastic and must be mounted on the
caravan floor inside a cabinet or storage area using the included
strap or a suitable battery clamp.
After mounting the PPP on the caravan floor, drill an 8 mm hole in
the cabinet wall for the remote button/LED. The button/LED
should be mounted in an area that is easily accessible to press
the button and viewing the LED. Pass the 3.5 mm jack plug and
the cable through the hole from the outside until the button locks
in place. The 3.5 mm jack can now be connected to the remote
button socket of the PPP.
4

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ppp-20Ppp-30Ppp-40

Inhaltsverzeichnis