Herunterladen Inhalt Inhalt Diese Seite drucken

Service And Testing; Transport And Storage - INTERSPIRO DP1 Benutzerhandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

1.
Pressurize the unit by opening both cylinder valves, wait for 3 minutes to
let the pressure stabilize.
2.
Tap on the pressure gauge.
3.
Close both cylinder valves and check that there is no visible pressure drop
during 30 seconds.
4.
At side A:
1. Open the vent valve and wait a few seconds to release the pressure in
the adapter hose.
2. Check that there is no audible leak at the cylinder connection.
3. Close the vent valve and open the cylinder valve.
5.
At side B:
1. Open the vent valve and wait a few seconds to release the pressure in
the adapter hose.
2. Check that there is no audible leak at the cylinder connection.
3. Close the vent valve.

Service and testing

Service and testing must as a minimum be carried out according to Interspiro's
Service and Testing Schedule with document number 30500, or according to
local requirements.
The latest versions is found under Downloads at interspiro.com.

Transport and storage

All parts should be stored in dry conditions, well protected from direct sunlight
and extreme temperatures. During transport, the equipment must be stored so
that the equipment cannot be damaged and people cannot be injured.
The equipment must not be stored where the temperature may be expected to
go above 70 ºC (158 °F). The equipment must be completely dry before being
put into storage.
DP1
25

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis