Herunterladen Inhalt Inhalt Diese Seite drucken

Blumfeldt Gold Bar 2000 Handbuch Seite 14

Infrarotheizstrahler
Vorschau ausblenden Andere Handbücher für Gold Bar 2000:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN
14
INSTALLATION
Before the installation, the following matters need your attention
• Products should be put down gently.
• Installation in acidic and alkaline environments is not recommended.
• The product must be earthed.
• The products are required to check the product brand mark on the
voltage
• and the local voltage whether conform.
• Ensure the power rating should have sufficient current carrying
capacity.
Ensure the production's installation site
For safe use of the product, the
product installation position
should have a minimum height
of 1.8 m from the ground, and
a minimum distance of 0.5 m
from ceiling, roof and both
sides walls.
Installation steps
1.
According to where
the product installa-
tion location is, use
a power drill to make
four 8 mm round
holes.
2.
Insert the three plas-
tic wall anchors into
the three holes.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

1003024710031513

Inhaltsverzeichnis