Herunterladen Inhalt Inhalt Diese Seite drucken

Operation Statistics - Caleffi 161010 Installationsanleitung Für Denqualifizierten Techniker

Der heizung
Vorschau ausblenden Andere Handbücher für 161010:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

TMax
Maximum temperature reached and held at the end of the rise.
TMax
Rise
Rise value.
Rise
Rise time
Rise/step duration
Rise time
Hold time
Hold time at TMax (hold time).
tBacking
Start
Slab drying activation/deactivation.
Slab drying
Rise time 24 h
tBacking 7 d
Start
Start
20
Language
Menu language selection.
(
Deutsch, English, Français, Italiano,Español, Português, 中文
Language
Reset
Reset to factory settings

5.5 Operation statistics

Displayed parameters:
Operation : count of the operating days
Pump: operating hours count for the relay
Mixer Open: operating hours count for the relay (System 1, 2)
Mixer closed: operating hours count for the relay (System 1, 2)
S1 value: measured temperature
S2 value: measured temperature
S3 value: measured temperature
Min. press.: minimum pressure
Max. press.: maximum pressure
Reset statistics
The statistics can be reset. To reset a value, proceed as follows:
Î Select the desired value with the right key (✓).
You will be asked to confirm: Reset?.
Î Turn Lightwheel
clockwise.
®
Yes and No will be displayed alternately.
Î Confirm the selection with the right key (✓). The value will be reset.
To exit from the procedure, press the left key (
)
).

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis