Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning And Initial Operation; Maintenance And Care - Parker Domnick Hunter System Bedienungsanweisung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

6
Limit contact high (depends on absolute value _EIH)
X
7
Limit contact low (depends on absolute value _EIL)
X
8
Limit comparator (depends on absolute value _EIH and _EIL)
X

Commissioning and Initial Operation

Please refer to the specification
label for the maximum admissible
temperature of the jacket. Ensure
that this temperature is never
exceeded at any point of the heat-
ing jacket, irrespective whether it
is switched on or off. Please ob-
serve the requirements of the
standards listed in "General Safety
Instructions"
and
Safety Instructions".
Proper functioning of the tempera-
ture device has to be checked
ahead of a initial operation.

Maintenance and Care

Maintenance and care is per-
formed according to the standards
listed in "General Safety Instruc-
tions" and "Additional Safety In-
structions", the regulations of the
employer's liability insurance as-
sociations applicable to the re-
spective way of use, as well as
14
_EIH
_EIH
_EIL
Due to technical reasons, the initial
warming-up
cause a certain discolouration of the
heated jacket – particularly close to
the element – which is utterly normal
and does not impede its operation or
its quality and also some smell will
emanate during initial operation; this
is caused by the increased tempera-
"Additional
ture and vaporising of non-toxic
agents. Make precautions for a good
ventilation during this process.
other relevant rules appropriate to
the application.
At least once per year the function
of the temperature-controlling and
temperature-limiting safety device
has to be checked and the surface
and power-cable should be in-
spected for visible damage.
_EIL
before
delivery
will
Inhaltsverzeichnis
loading

Inhaltsverzeichnis