Chapter 7. Ordinary maintenance
7.3. Replacement of the Teflon and the sealing blade
Before replacing teflon and the sealing blade wait for the machine to be properly cooled.
Remove the sealing bar (16) from its seat.
Remove the teflon adhesive tape.
Unscrew the screws fastening the blades to each end of the sealing bar.
Tighten the new blades. Make sure they are tout enough before blocking them.
Use the teflon adhesive tape to cover the sealing blades.
Place the sealing bar into its seat.

7.4. Replacement of the cover gasket

When the cover gasket (17) is worn out, replace it. This will improve the efficiency of the machine and increase its speed
rate. Replacement is very easy. After having removed the gasket which has worn out, clean its seat and insert the new
gasket in a linear way. Make sure its ends are joined. Leave no opening which might prevent the product from being properly
vacuum-packed.

7.5. Cleaning machine

Use a normal wet cloth to clean the plexiglas cover (18).
Never use detergents or solvents which might damage the hood and reduce its transparency as well as its resistance.
Use normal detergents for stainless steel to clean the case and the internal tank.

7.6. Pump oil replacement

!
Every 3-4 months check the oil level in the pump by removing the front panel. Change the pump oil in case of a change
in colour due to the presence of powders or liquids.
!
Completely change the pump oil every 250 working hours or at least once a year (use the hydraulic oil of the type
specified on the pump).
N.B.: the oil you have replaced must be eliminated according to the procedures established by the
laws in force in the country the equipment has been installed.
(20) PLUG FOR OIL DISCHARGE (to completely replace old oil)
(21) OIL FILLING PLUG

7.7. Wiring diagram

(Single phase version)
IG
Main switch
FU1
Line fuse
FU2
Pump fuse
FU3
Blade fuse
FU4
Auxiliary trasformer fuse
KM1
Motor contactor
(Three phase version)
IG
Main switch
FU1
Blade fuse
FU2
Auxiliary trasformer fuse
KM1
Motor contactor
KM2
Blade heater contactor
KE1
Air re-immission valve

7.8. Pneumatic diagram

CV
Vacuum hood
UG
Gas nozzles
BA
Suction pipe union
EV
Gas airvalve

7.9. Disassembling, demolition and elimination of residuals

ATTENTION!
All operations about disassembling and demolition must be done by qualified personnel with mechanical
and electrical expertise required to work in security conditions.
Proceed as follows:
1.
disconnect machine from power mains
2.
disassemble components
3.
remove oil from the pump
All wastes must be treared, eliminated or recycled according to their classification and to the procedures in force
established by the laws in force in the country the equipment has been installed.
KM2
Blade heater contactor
KE1
Air re-immission valve
KE2
Gas injection airvalve
KE3
Sealing airvalve
M
Pump motor
T1
Blade transformer
KE2
Gas injection valve
KE3
Sealing valve
M
Pump motor
T1
Auxiliary transformer
T2
Blade transformer
T3
Blade transformer
EA
Air airvalve
ES
Sealing airvalve
PG
Gas pressure switch
BG
Gas cylinder
11
T2
Auxiliary transformer
EH
Blade heater
EH1
Blade heater
SQ
Limit switch
B1
Gas sensor
SE
Electronic board
EH1
Blade heater
EH2
Blade heater
SQ
Limit switch
B1
Gas sensor
SE
Electronic board
I1
Automatic switch
MP
Pneumatic membrane
PS
Vacuum pump
S