Herunterladen Inhalt Inhalt Diese Seite drucken

Hangar 9 Composite QQ Yak-54 2.6m Bedienungsanleitung Seite 46

Inhaltsverzeichnis

Werbung

engine dome preparation For da-120 • • •
4
Using a drill and 1/16-inch drill bit, make a pilot hole. Then use 1/8-inch,
¼-inch and 5/16-inch drill bits respectively and enlarge the hole.
46
Downloaded from
www.Manualslib.com
5
Insert blind nuts and using a 4.5mm ball driver along with the 1-inch standoff
needed for the engine installation, pull the blind nuts in the engine dome.
manuals search engine
6
Mark the top of the engine dome for ignition module and ignition battery
installation by tracing the outside of the ignition box and battery.

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Hangar 9 Composite QQ Yak-54 2.6m

Inhaltsverzeichnis