Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation - GEZE TS 4000 R IS Montageanleitung

Zweitgerät gestängetürschließersystem mit integrierter schließfolgeregelung, elektrischer feststellung und integriertem rauchschalter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Initial operation

7
Initial operation
CAUTION!
To avoid unnecessary contamination the installation of the smoke switch should be undertaken only just
before the initial operation.
In case of early installation there is a risk that the smoke switch is contaminated by construction dust. This
shortens the life of the smoke switch considerably!
7. 1
Remove cover on moving leaf
Remove protective cap (1.).
X
X
Remove cover (2.).
X
X
7.2
Installation and connection of the smoke switch
Clip on smoke switch (1.).
X
X
Plug in 24 V cable of the door closer (2.) and the power pack (3).
X
X
For additional connections, see the separate document "Instructions for Installation, Commissioning, Operation
X X
and Maintenance of the GEZE Hold-Open Device FA GC".
GB 8
TS 4000 R IS
Fig.: 7.1.1
Fig.: 7.2.1
Fig.: 7.2.2

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ts 4000 r

Inhaltsverzeichnis