Herunterladen Inhalt Inhalt Diese Seite drucken

Inhaltsverzeichnis - Daikin Altherma 3 R ECH2O Installation Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Altherma 3 R ECH2O:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 39
List of contents
List of contents
1.1
Particular safety instructions .....................................................
1.1.1
Observing the instructions ..........................................
1.1.2
Meaning of warnings and symbols..............................
1.2
1.2.1
General .......................................................................
1.2.2
Intended use ...............................................................
1.2.3
Installation room..........................................................
1.2.4
Electrical installation ...................................................
1.2.5
1.2.6
1.2.7
Operation ....................................................................
1.3
1.4
Warranty conditions...................................................................
2.1
Design and components............................................................
2.2
Function of the 3-way changeover valves ................................. 10
3.1
Dimensions and connection dimensions ................................... 11
3.2
Transport and delivery............................................................... 12
3.3
Installing the heat pump ............................................................ 12
3.3.1
Selecting the installation site....................................... 12
3.3.2
Installing the device .................................................... 13
3.4
Preparing the device for installation .......................................... 13
3.4.1
Remove the front screen............................................. 13
3.4.2
Remove the protective cover ...................................... 14
3.4.3
3.4.4
Open the switch box ................................................... 14
3.4.5
3.4.6
Opening the air purge valve........................................ 15
3.4.7
return flow ................................................................... 16
3.4.8
Making the hood opening............................................ 17
3.4.9
3.4.10
Securing the hood....................................................... 17
3.5
Installing optional accessories................................................... 18
3.5.1
3.5.2
set (EKBUHSWB) ....................................................... 18
3.5.3
Installation of the DB connection kit............................ 18
3.5.4
Installation of the P connection kit .............................. 18
3.6
Water connection ...................................................................... 19
3.6.1
Minimum water volume ............................................... 19
3.6.2
Connecting hydraulic lines .......................................... 19
3.6.3
Connecting the drain................................................... 20
3.7
Electrical connection ................................................................. 20
3.7.1
Overall connection diagram ........................................ 22
3.7.2
3.7.3
Mains connection ........................................................ 23
3.7.4
3.7.5
Connecting the heat pump outdoor unit...................... 23
3.7.6
(optional) ..................................................................... 24
3.7.7
External switching contact .......................................... 24
3.7.8
EBA (external requirement request) ........................... 24
3.7.9
Connecting an external heat generator....................... 25
3.7.10
Connecting the room thermostat................................. 26
3.7.11
3.7.12
Connecting the HP convector ..................................... 26
3.7.13
3.7.14
Low rate mains connection (HT/NT) ........................... 27
3.7.15
3.8
Connection for refrigerant.......................................................... 28
3.8.1
Laying refrigerant piping ............................................. 28
Installation and operating manual
2
3.8.2
3.9
Filling the system........................................................................ 29
3.9.1
manometer................................................................... 29
3.9.2
Filling hot water heat exchangers ................................ 29
3
3.9.3
Filling the storage tank................................................. 29
3
3.9.4
Filling the heating system ............................................ 29
3
4
4
4
5.1
Requirements ............................................................................. 31
5
5.2
Commissioning at low ambient temperatures ............................ 31
5
5.3
Bleeding the hydraulic system.................................................... 31
6
5.4
Checking the minimum flow ....................................................... 32
6
5.5
Start screed drying (only if required) .......................................... 32
6
5.6
Commissioning checklist ............................................................ 32
6
5.7
Handover to the operating company .......................................... 33
6
7
6.1
Information on the type plate...................................................... 33
8
6.2
Characteristic lines ..................................................................... 33
8
6.2.1
Sensor characteristic lines ........................................... 33
6.2.2
Characteristic curves for pumps .................................. 34
11
6.3
Tightening torques...................................................................... 34
6.4
Minimum floor area and ventilation openings............................. 34
6.5
Electrical connection diagram .................................................... 36
6.6
Piping diagram for refrigerant circuit .......................................... 38
30
31
33
Daikin Altherma EHS(X/H)(B)-D
Daikin Altherma 3 R ECH₂O
008.1451099_00 - 07/2020

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis