  3‒10 Open the switch box
3 Hook in the cover on the switch box with the lateral hooks.
  3‒11 Hooking in the cover
3.4.5

Removing the bottom thermal insulation

CAUTION
The thermal insulation consists of pressure-sensitive EPP
moulded parts that can be easily damaged if not handled
correctly.
▪ Only remove the thermal insulation in the order stated
below and in the stated directions.
▪ Do not use force.
▪ Do not use tools.
1 Remove the thermal insulation in the following order:
▪ Pull the side insulating element off horizontally (item a).
▪ Pull the rear insulating element off horizontally (item b).
▪ Pull the front insulating element off horizontally (item c).
Daikin Altherma EHS(X/H)(B)-D
Daikin Altherma 3 R ECH₂O
008.1451099_00 – 07/2020
3 Set-up and installation
  3‒12 Removing the top thermal insulation
a
Side insulating element
b
Rear insulating element
c
Front insulating element
2 As required: Remove the bottom thermal insulation in the
following order:
▪ Pull the side insulating element off vertically (item a).
▪ Pull the rear insulating element off vertically (item b).
  3‒13 Removing the bottom thermal insulation
a
Side insulating element
b
Rear insulating element
INFORMATION
The thermal insulation is installed in reverse order.
3.4.6

Opening the air purge valve

1 Removing the thermal insulation (see
insulation" [ 4  15]).
bottom thermal
2 Open the air purge valve on the pump by one turn.