AWG I Operating manual I Fittings I
7
MAINTENANCE
7.1
Inspection and maintenance
Apart from the visual inspection and cleaning of the AWG Foam noz-
zles, no regular maintenance work is required.
7.2
Repair
1
Hand lever
2
Disc
3
Screw
4
Pressure gauge
5
Protection ring
6
Handle
Fig. 3
Repair
36 / 40
Adjustable foam nozzles S2/M2, S4/M4
10
11
ENGLISH
7
Cylinder head screw
8
Disc
9
Internal thread screw
Conversion screen
Oval head screw
MAINTENANCE
M1108B10 I Rev. 02-03/20