Herunterladen Inhalt Inhalt Diese Seite drucken

Schartec Porte 150 Anleitung Seite 22

24v dc
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

11. Temporarily secure the front bracket to the gate with a clamp. See Figure 13.
12. Now use the keys to unlock the motors and pull out the spindles.
13. Lift the motor and insert the screw into the front motor mount.
14. Now lift the rear part of the motor and move the gate wing until the motor can be fixed to the rear bracket as
shown in Figure 14. Push the bolt through the hole provided in the motor and through the rear bracket and
tighten the screws.
15. Tighten screw A with nut B on the rear bracket and then loosen the nut half a turn to allow the motor arm to
rotate.
16. Now open and close both gate leaves once by hand to check that the motors are running correctly.
17. Make sure that the front bracket can be permanently attached to the gate wing.
18. After checking, use the keys to lock the motors again.
19. Guide the motor cable from below through the hole into the interior of the drive and fasten it using the screw
terminal.
20. Now connect the motor cable as in Figure 16. Use a flexible 2-core 0.8mm² rubber cable here.
Bild 15
Figure 13
A
B
M+ (positiv)
Motor
M- (negativ)
Hall Sensor
Hall Sensor
Hall Sensor
22
Figure 14
Bild 16
5V
Signal
GND

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Porte 300

Inhaltsverzeichnis