3. Installation Preparations

Tools needed for Installation
Please make sure that the tools listed below are available for installation.

4. Installing the Control Box

1. Loosen the screws to the cover and remove it.
2. The four fastening points for the control box are exactly at the position at which the cover is screwed on.
CAUTION! Never drill through the control box housing, otherwise your guarantee and warranty will be forfeited.
3. Select the desired mounting position of the control box. Mark the four attachment points. Drill the holes with a
suitable drill and then fasten the control box with the supplied screws and dowels.
Mains Connection (Power Supply)
The mains connection may only be carried out by a qualified person. The control is connected via a 3x1.5 mm²
cable, which must not be longer than 10 m. Carefully read the assembly instructions for the gate operator
before proceeding. Make sure that the cables are properly layed and and properly inserted to prevent cable
breakage. The arrangement of the accessories should therefore be predetermined.
Note on the power supply connection
1.
The electrical installation and connections for the gate operator may only be carried out by a qualified electrician.
2.
The supply line for the gate operator must be equipped with an over-voltage fuse. Before all electrical work, the
system must be de-energised. Safeguard the system against being switched on again without authorization.
Figure 3
WARNING!! The control box may
only be mounted using to the four
points provided. Drilling through
the control box is prohibited and
will void the warranty.