Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Check-Up; Hot Water - La Cimbali M39 GT R2 Gebrauch Und Installation

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 103

5. Installation Check-up

WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C)
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-levelling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
GROUPS
Let each group dispense water for about a minute.

HOT WATER

Continuously dispense hot water (pressing the appropriate button) until at least 5 liters of water have been used for
a machine with 2 - 3 groups (see the "Cleaning and Maintenance" Chapter in the User's Manual).
STEAM (also with Turbosteam)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
.
6 EN

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis