Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Commissioning; Filling With Water; Control Points; Handover To End-User - Panasonic PAW-BTANK50L-2 Installationsanleitung

Wärmepumpen-pufferspeicher
Vorschau ausblenden Andere Handbücher für PAW-BTANK50L-2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50

4. INITIAL COMMISSIONING

4.1 Filling with water

First check that all pipes are connected correctly.
Then do the following:
A) Vent the system, preferably at its highest
point.
B) Open water supply to the product. When
water flows out of the vent the system is full.
C) Fit the Automatic air vent valve (1) to the top
connection, max. torque 5 Nm.

4.2 Control points

A) Check that all pipe connections to/from the
product are tight and not leaking.
B) Check that the product is standing/hanging
level vertically and horizontally.
4.3 Draining
!
The water temperature in the product is high and
could cause scalding. Special care should there-
fore be taken when emptying the product.
A) Disconnect the power supply.
B) Shut off incoming water supply.
C) Open the air vent valve (2). Leave open while
emptying (prevents vacuum).
D) The product is emptied via the drain cock (2).
After emptying, close the drain cock (2).
E) Close air vent valve (1).

4.4 Handover to end-user

THE INSTALLER MUST:
Brief the end-user on safety and maintenance
instructions.
Brief the end-user on settings and emptying the
product.
Hand this installation manual over to the end-
user.
Enter contact details on the type plate on the
product.
WARNING
1
2
9

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis