Herunterladen Diese Seite drucken

KERN YDB-02 Betriebsanleitung Seite 12

Set zur dichtebestimmung für präzisionswaage
Vorschau ausblenden Andere Handbücher für YDB-02:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3 Installation with KERN EMB 2000-2V
Fig.1: KERN EMB 2000-2V with installed density sets KERN YDB-02
 Disconnect scale from power supply.
 Remove the standard weighing plate and replace it with the density set.
 Place the platform for glass containers in a way that it does not touch the
 Place beaker in the centre of the platform Make sure that it has no contact with
 Hang the immersion basket on the rack. Make sure that it is centred in the
 Pour the liquid into the glass beaker. Filling height should be approx. ¾ of the
 Heat the liquid, the instruments or the sinker until the temperature is constant.
6
Downloaded from
www.Manualslib.com
weighing plate.
the frame.
recess.
capacity. Immerse thermometer
Observe the warm-up time of the balance.
For further information, as well as the procedure of density
determination please see the operating instructions added to the
density balance KERN EMB-V or on the KERN homepage
sohn.com).
manuals search engine
(www.kern-
YDB-02-BA-e-1310

Werbung

loading