Herunterladen Inhalt Inhalt Diese Seite drucken

Power Supply; Operation - Nedo X-Liner 2 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

5 Power Supply

When starting up the X-Liner 2 for the first time, install the three batteries supplied, as shown in
the battery compartment.
Insert /replace batteries
The X-Liner 2 requires 3 batteries, 1.5
V (AA).
• Turn the battery compartment cover
in the direction of the arrow
• Remove the battery compartment
cover.
• Insert/replace batteries as specified.
Ensure pole direction is correct!
• Attach the battery compartment
cover and press downward.
• Turn the battery compartment cover
in the
direction.
If the battery charge is weak, the LED
display (4, Fig. p10) begins to flash. If
the batteries are too weak the laser
switches off.

6 Operation

6.1 Starting up the unit
 Set up or fix the unit according to the intended use. Ensure the levelling range of ±4° is not
exceeded.
 Lock the pendulum locking device for use without self-levelling. To do this, push the unit
switch into position 1
 Release the pendulum locking device for use with self-levelling. To do this, push the unit
switch into position 2
flash in this position the X-Liner 2 is outside the self-levelling range.
 If you have finished working with the unit, lock the pendulum locking device and use the
ON/OFF button (press for 3 secs.) to switch off the unit.
6.2 Self-levelling
The X-Liner 2 has a self-levelling feature. If the unit is
placed in a slanted position of up to 4° in any direction,
the laser beams are plumb and horizontal.
If the 4° range is exceeded, the projected laser line
flashes.
Operating Instructions X-Liner 2
1
.
3
and use the ON/OFF button to switch on the unit.
and switch on the unit with the ON/OFF button. If the laser lines
2
4
EN
11

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis