Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Commissioning; Installing The Modules - axing SKS 40-00 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3. Installation and commissioning

 Installation must be performed by authorized and skilled electricians only.
 Before inserting or changing a module, pull the mains plug from the socket!
 Installation of the device must be performed in compliance with the safety regulations defined by the
EN 60728-11 standard. Connect the device with an equipotential bonding cable (copper, minimum 4 mm²).
 Make sure that the supply voltage is within the permitted range.
3.1.

Installing the modules

Unscrew both lower screws (2) in order to remove the housing cover of the SKS 40-00/8-00. Flap the housing
cover upward and remove it.
Unscrew the four rear fixing screws (3) in order to remove the 19" installation frame of the SKS 4-01.
Position the headend modules on the output combiner and fasten them with screws.
The output combiner of the SKS 40-00 and 4-01 has one DC connecting socket. The output combiner of the SKS 8-
00 has two DC connecting sockets. One on the left and one on the right.
2015-12-02 | © AXING AG Switzerland | Subject to change in design and type; errors and misprints reserved
7

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sks 4-01Sks 8-00

Inhaltsverzeichnis