Herunterladen Inhalt Inhalt Diese Seite drucken

Vexve TERMOVAR Handbuch Seite 29

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Termovar installation in a nutshell:
· The installation of the device must be carried out by a professional!
· The piping between the boiler and storage tank must not be too long; otherwise the flow resistance will
increase too much and at high power the working temperature of the boiler will rise excessively.
· The boiler and storage tank must be at the same level and the pipe runs are straight, otherwise the self
circulation will not work.
· Termovar installation should be the upright as shown, otherwise its operation will be compromised.
· Special attention must be paid to air bleeding of the pipe work. Air vent valves should be placed at
both ends of the boiler and storage tank connections.
· It is not recommended to use automatic deaerators.
· The higher setting thermostat, included with the Termovar unit in some cases, should only be installed
after the first 10 heating cycles (if boiler manufacturer recommends this). This reduces the air formation
from one heating cycle.
· After initial installation, if the entire storage tank is cold, a particularly large amount of energy is required
to load the entire system.
· All the air is bled from the system only after several cycles, when the whole system has been heated
several times.
General spare parts
1920076
Return flow preventer
www.vexve.com
1920061
Spare thermostat set 45 ºC
1920062
Spare thermostat set 55 ºC
1920063
Spare thermostat set 61 ºC
1920064
Spare thermostat set 72 ºC
1920065
Spare thermostat set 80 ºC
1920811
Self circulation blocking plate
EN
29

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis