Herunterladen Inhalt Inhalt Diese Seite drucken

Idegis D-10 Bedienungsanleitung Seite 39

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

In case the cell was installed in by-pass (recommended option), a valve to
regulate the flow must be introduced.
Before proceeding to the definitive installation of the system, the following
commentaries might be considered:
o Flow direction marked in the cell must
be respected.
o Recirculation system must guarantee
the minimum flow stated in the Table
of TECHNICAL SPECIFICATIONS for
each model (see Section 1.3).
o The system flow detector activates if
there is not recirculation (flow) of water
through the cell or flow is very low. If
electrolysis gases are not properly
removed outside the electrolysis cell,
the generated gas bubble electrically
isolates the auxiliary electrode
(electronic detection). Therefore, when
introducing the electrodes in the cell,
the level probe (auxiliary electrode)
will have to be located in the higher
area of the cell. The safest disposition
is shown in the recommended
installation diagram. Other dispositions
would only be acceptable if detection
of low flow is also allowed.
o WARNING: the flow detector will not
work correctly, with the consequent
risk of cell breakdown, if the in-out
valves of the electrolysis cell are
closed simultaneously. Although this
situation is extremely unusual, it can
be easily avoided once the equipment
has been installed, blocking at opened
position the return valve to the
swimming pool, so it cannot
accidentally be manipulated.
4

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

D-18D-25

Inhaltsverzeichnis