Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly; Mounting The Spotlight - LIVARNOLUX HG01045 Montage-, Bedienungs- Und Sicherheitshinweise

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 44
the main station. The technical data of the
charging device must comply with information
given in the section "Technical data".
Note: During the charging process, the solar
cell
must not be connected with the main
13
station
.
3
Note: The signal LED
socket lights red for as long as the charging is
in process. The signal LED lights green as soon
as the charging process has ended. The recharge-
able battery is now ready for use.
Note: Depending on the charge state of the
battery, the charging process may take up to
24 hours. The built-in charging controller of the
spotlight prevents the rechargeable battery
from overload.
Charging the rechargeable batteries with
a solar cell
Slide the AUTO / OFF switch into the OFF posi-
tion, so the charging process is not influenced
by the light being switched on.
Insert the plug
of the solar cell cable into
15
the solar electricity socket
Position the solar cell as described in section
"Mounting the solar cell".
Note: With steady exposure to sunlight, the
rechargeable battery is fully charged after 4 to
6 days. The duration of the charging process
depends on the charge state of the rechargea-
ble battery as well as the quality of the expo-
sure to sunlight.

Assembly

Before mounting, decide where you want to
mount the solar cell
The solar cell and the main station can be
mounted independently of each other, but after
being mounted must be connected with the ap-
prox. 4.75 m long power cable of the solar cell.
After the mounting, lay the cable so it is not
subject to any mechanical stresses. Use typical
installation material such as cable clamps or
conduit to fasten the cable, to prevent damage
to the insulation.
8
GB
next to the charging
19
of the spotlight.
11
and the main station
13
Note: The included mounting material is suita-
ble for ordinary solid concrete or masonry
construction. Other wall substrates may require
other fastening materials. Seek specialist
advice if necessary.

Mounting the spotlight

When selecting the mounting location for the main
device, pay attention to the following:
– Make sure the spotlight
illuminates the desired area. You can move the
spotlight.
– Make sure the motion detector
desired area. The motion detector has a maxi-
mum coverage range of 12 m, with a coverage
angle of about 180° (depending on the
mounting height – a height of 2.00 m–2.50 m
is ideal) (see Fig. B and C).
– Make sure the motion detector is not illuminated
at night by street lighting. This can influence its
functioning.
Note: You can mount the main station with the
mounting holes
2
Mounting with the mounting holes:
Drill 2 holes. Mount the main station with the
mounting holes by using the dowel
(ø 8 mm) and screws
(see Fig. D).
After mounting, check that the main station is
fitted securely.
Mounting with the wall bracket:
Drill 2 holes. Mount the wall bracket
.
using the dowel (ø 8 mm) and screws
3
(ø 4.5 x 40 mm) (see Fig. F).
Note: The included mounting material is suitable
for ordinary solid concrete or masonry construc-
tion. Other wall substrates may require other
fastening materials. Seek specialist advice if
necessary.
After mounting, check that the wall bracket is
fitted securely.
of the main station
7
covers the
6
or the included wall bracket
18
(ø 4.5 x 40 mm)
12
17
3
.
17
by

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis