Herunterladen Inhalt Inhalt Diese Seite drucken

Elektror S-XP series Betriebs- Und Montageanleitung Seite 16

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operating and assembly instructions S-XP
8 DECLARATION OF INSTALLATION CONFORMITY PURSUANT TO ANNEX II 1 B
DECLARATION OF CONFORMITY IN ACC. WITH EVPG (ENERGY CONSUMPTION
RELEVANT PRODUCTS ACT).SECTION 4 PARAGRAPH 1
EN
As manufacturer,
Elektror airsystems gmbh
Hellmuth-Hirth-Strasse 2
D-73760 Ostfi ldern
herewith declares that the product, to which this declaration relates, complies with the following essential requirements of
the Machinery Directive (2006/42/EC).
Description of the partially completed machine:
High pressure blower S-XP 240/40, 245/20
The serial number and year of manufacture can be found on the rating place and the corresponding delivery note.
Description of the essential requirements of Machinery Directive (2006/42/EC), with which the partially completed
machine complies:
• Machinery Directive (2006/42/EC): Annex I, Articles 1.1.2, 1.1.3, 1.1.5, 1.3.2, 1.3.3, 1.3.4, 1.3.7, 1.5.1, 1.6.1, 1.7.1, 1.7.3
• Electromagnetic Compatibility Directive (2014/30/EU)
• Eco-design Directive for Energy-related Products (2009/125/EC)
The partially completed machine described here continues to fulfi l the protective regulations of the Low Voltage Directive
(2014/35/EC) according to Annex I, No. 1.5.1 of the Machinery Directive.
The commissioning of the partially completed machine is not permitted until it has been verifi ed that the machine in which the
partially completed machine is to be installed, complies with the provisions of the Machinery Directive (2006/42/EC).
The following harmonised standards have been applied:
DIN EN ISO 12100 2011
DIN EN 60034-1
DIN EN 60034-5
DIN EN 60204-1
DIN EN 60664-1
16
As manufacturer, Elektror airsystems undertakes to forward the special technical documentation in respect of the partially completed
machine to national authorities at their request. The special technical documentation in respect of this partially completed machine
according to Appendix VII Part B has been created.
Responsible for the documentation: Mr Kevin Kargar, Tel. +49 711 31973-1179.
Kreher (Managing Director)
Ostfi ldern, 17.01.2020
Safety of machinery - General principles of design -
Risk assessment and risk reduction
2011
Rotating electrical machines,
Part 1: Rating and performance
2007
Rotating electrical machines,
Part 5: Degrees of protection provided by the integral
design of rotating electrical machines (IP code) – Classifi cation
2019
Safety of machinery – Electrical equipment of machines,
Part 1: General requirements
2008
Insulation coordination for equipment within low-voltage systems,
Part 1: Principles, requirements and tests
www.elektror.com

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

S-xp 240/40S-xp 245/20

Inhaltsverzeichnis