Herunterladen Inhalt Inhalt Diese Seite drucken

Sanotechnik PR150 Montageanleitung Seite 21

Mit radio und beleuchtung
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

the company SANOTECHNIK. The intervention fee is payable by the customer, which is payable directly
to the customer service. But not on installation and removal, and all other costs, these are excluded.
Operational noises do not justify a complaint.
Excluded from the warranty, defective parts, whose failure to negligence, improper use, use-wear,
improper installation, maintenance by unlicensed personnel, are due damage in transit, such as backups,
for example, decorative elements, etc.
By poor compliance with the instructions of the manufacturers of any direct or indirect liability
declines to persons or property. Indirect damage, w. for example, consequential damages due to lack
of use or removal of any manufacturer is not liable.
For repairs after the warranty period, the parts replaced, in work and travel expenses - according to the
applicable rates set - into account. The current rates of fees, you can ask your customer service.
TERM OF USE and
CARE:
5.
The complete shower always be kept clean to avoid bacterial contamination. Use only mild, organic
cleaning products. Always clean with a soft cloth.
When calcium deposits (blockages) of head or hand shower with rubber studs, you can easily be cleaned
with a finger.
In head-or hand-held showers without rubber nubs from time to time you should clean with a needle
(calcified pierce holes)
! ATTENTION ! ATTENTION ! ATTENTION !
The complete shower is fixed before mounting again carefully for any visible damage check, including the
assembled components. The same applies to the surface of the Fertigduschkabine, furthermore conducted
must necessarily be a trial run.
MOUNTING
ATTENTION!! Please note that the pre-drilled holes do not necessarily have to have something with the
assembly of the parts. The existing holes are introduced by production. All parts are screwed according to
the following installation instructions with each other, with the holes must be drilled for this purpose by
means of steel drill bit. Where appropriate, can fit in the existing wells be shared.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pr170

Inhaltsverzeichnis