Herunterladen Inhalt Inhalt Diese Seite drucken

Water Installation - Sanotechnik PR150 Montageanleitung

Mit radio und beleuchtung
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH – ENGLISH - ENGLISH
Introduction
Before you unpack the shower, you check the packaging for damage. Later complaints will not be
1.
recognized. Before assembling, all parts for damage and completeness are checked. In case of problems
contact the seller and us time and you will get a satisfactory answer.
For installation the following tools is required: drill, screwdriver, spirit level, tape measure, pen,
2.
ringwrench.
With embossed glass or frosted glass is to be noted is that the smooth side mounted to the inside.
3.
It is all factory-fitted shower room for testing purposes, connected, tested and packaged.
4.
Place the shower tray and using adjustable feet, so set that no water remains in the shower tray.shower
5.
tray. IMPORTANT: stress test. Subsequent complaints are excluded.
The assembly should be conducted only by authoritarian specialist firms (eg plumber), otherwise it will
6.
void the warranty. (See also note for connection of water and electricity)
It is observed the enclosed assembly instructions and all parts must be additionally sealed against each
7.
other with sanitary silicone (silicone) Leak test. In addition, need to be checked all the screws, hose
clamps, etc. to its strength and tightness. It might have come loose due to the transport something.
INSTALATION – MAINTENANCE – WARRANTY – SECURITY – TERM OF USE
TECHNICAL DATA:

WATER INSTALLATION

1.
(On site) The connection may be performed by an officially licensed installation companies. The
installation requirements of the local water company and the provisions of DIN 1988 are to be
observed strictly. For the sewer connection is to provide for a trap.
Attention: No rigid pipe connections between Fertigduschen and water - risk of breakage! This line must
be secured by a Rohrunterbrecher type A2 according to DIN 1988. The connections must be flexible,
allowing an unobstructed maintenance or service at any time.
The water temperature of the water, which flows through the faucets and showers can be max. 60
The water pressure can be max. 4 bar.
In general, observed for the water installation with all legal requirements
WATER
CONDUCT: (On site) Ø40mm (Ø 50mm)
2.
There must be a flexible, extensible intermediate (50 cm) between the siphon and sewer connection be
installed so that a push back for maintenance or service is possible.
ELECTRICAL
INSTALLATION:
3.
(On site) The electronic connection may be performed only by an officially licensed electrical company.
The installation requirements of local utility companies and the provisions of DIN 57100 or VDE 0100
Part 701 must be strictly observed. The cable (sheathed cable H05VV-f3G2, 5 YMM-J 3x2, 5 mm ² up to
3500 watts) must have an earth leakage circuit breaker (at least 25 A 230/400 V ~ Auslösenennstrom I =
0.03 A are held) and a circuit breaker IN = 16 A or 25 A U-type (in Austria: IN = 13 A 16 or A C-Type
will be protected). Similarly, this circuit must be switched off with an all-pole switch with at least 3 mm
contact gap. (must be in the protected area 3) are the equipotential line (at least 4 mm² copper) is
connected to the appropriate agencies. Schematic is attached.
APPOINTMENTS
4.
The warranty is required by law during the period from the date of purchase. This must be the basis of a
cash card or a payment document - the name of the dealer and the date of sale aufscheinen -.
Customer Services for Sales Territory Austria: It will only be reported in writing customer service jobs, as
performed, for example, guaranteed rates, or accepted if this is proven by a written message with proof of
purchase (cash receipt) ... the service there.
The warranty covers repairs and replacement of components of the device, which must be recognized by
Conection 220 V / 50 Hz, Control 12 V,
Water pressure 1-3 bar, max 60
:
CLAUSES:
o
o
WW, max. 9
DH
o
C

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pr170

Inhaltsverzeichnis