PITCHING INSTRUCTIONS
1
Unpacking
• Unpack the awning and unfold so the groundsheet is on the bottom and the flysheet is on
the top.
2
Pumping
• You are ready to inflate your awning.
• Before you inflate your awning make sure you have read and understood the pump and
inflation section of these instructions. You must follow these instructions to ensure proper
inflation of your awning.
• Inflate your awning using the pump supplied ensuring the safety pressure valve is
connected to the pump at all times.
• Pump each air tube(s) in turn, until all have been pumped up and sprung into place.
1
2
5