Herunterladen Diese Seite drucken

Raychem EM4-CW Installations- Und Betriebshandbuch Seite 8

Heizkabel

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 21
Layout Considerations
Area to be heated
Determine the exact area to be heated, e.g. wheel tracks. Consider the following factors:
Do not run the heating
cable over expansion joints.
Heat the surfaces on which
braking will occur, e.g. before
a barrier or a magnetic card
reader.
First make sure that the area to be
heated complies with the data in the
design instructions. Establish where the
junction boxes are to be installed and
check that the connection leads are long
enough.
8
Covered
area
Covered area
Lay the heating cable right
up to the drain-off gutter.
The length is 4 m.
Thoroughly clean the substratum before
starting to install the heating mat, as
sharp objects can damage the heating
cable.
The EM4-CW-Cable must not be
shortened or spliced.
Heat at least one
metre into the
covered area.
Heat the covered
area of the entry, as
incoming vehicles
can bring in snow.
Heat the
drain-off
gutter.

Werbung

loading