Herunterladen Diese Seite drucken

Raychem EM4-CW Installations- Und Betriebshandbuch Seite 18

Heizkabel

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 21
Proceed as follows:
• Connect one lead to the heater braid.
• Connect the other lead to both heater
conductors together.
• Apply voltage. The resistance reading
must be greater than 100 MΩ.
• If the insulation resistance is less than
this, the heater may be damaged.
Where possible, locate the fault and
rectify. Record the insulation resistance
value on the Installation Test Record.
Conductors
Finishing
Complete Sensor
Complete the installation of the sensor
(where necessary).
Install Panel and Controls
Install the electrical panels according to
the manufacturer's instructions.
Install control units, thermostats and
manual control equipment in accordance
with the manufacturers' instructions.
18
Braid
Finishing
Install a grid over the drain to ensure that
the heat strip is protected from damage.
Note: A 30 mA residual current
device (rcd) is required for the drain
tracing. Ensure that there are no
more than 60 m of heating cable
connected to each 30 mA rcd.
2500 Vdc Insulation resistance tester
Complete Wiring and System
Follow applicable local regulations.

Werbung

loading